Compliance and Approval Questions on Projects

The design is finished and the approvals have not started. A checklist for the consents that set the programme.


A design is completed on schedule and everybody is pleased. The client asks when work can start on site.

The answer is not for several months, because planning has not been applied for, building control has not been engaged, a utility diversion needs agreeing and an environmental assessment has a seasonal survey window that has just closed.

Nothing about the design was late. The approvals were treated as a stage after design rather than as a parallel process, and the programme was never about the drawings.

1. Establish which approvals apply at the outset

Planning, building control, utilities, highways, environmental, landlord, freeholder and anything sector specific. The list is longer than most clients expect and it varies with the project.

2. Name who is responsible for each

Client, design team, specialist consultant or contractor. This is where things fall through entirely, because everybody assumes somebody else is handling it.

3. Explain that approvals are not one process

Clients frequently think in terms of permission as a single thing. Explaining that several separate bodies each have their own process and timescale reframes the whole programme.

4. Start the long ones first

Environmental assessments, utility diversions and anything with a consultation period. These are the items that set the earliest possible start date.

5. Watch for seasonal windows

Ecological surveys and certain assessments can only be carried out at particular times of year. Missing one delays a project by months and it is entirely invisible to a client.

6. Explain the pre application route

Where an informal discussion before a formal submission is available, it frequently saves more time than it costs, and clients rarely know it exists.

7. Explain the difference between permission and conditions

A permission with conditions attached is not a permission to start. Discharging conditions takes time and it surprises clients who believed the approval was the finish line.

8. Explain building control as a parallel process

Separate from planning, with its own submission, inspections and sign off. These two are conflated constantly and the confusion causes real delay.

9. Identify the third party agreements early

Party wall matters, easements, landlord consents and neighbour agreements. Each of these involves somebody with no interest in your programme.

10. Explain what happens if something is refused

Amendment, appeal or redesign, with the timescale for each. Clients should know the downside before committing rather than discovering it afterwards.

11. Explain the inspection requirements during construction

What must be inspected, at what stage and with what notice. Missing an inspection can mean opening up work that has been covered.

12. Keep the programme honest about approvals

They are the critical path on most projects and they belong at the front of any programme conversation, which is the ground in programme and timescale questions.

13. Establish the scope of what is being consented early

Feasibility work frequently determines what is even likely to be approved, which is the groundwork in scoping and feasibility questions from new clients.

14. Answer the approvals question at the first enquiry

An assistant that establishes the project type, location and scale, sets out which approvals are likely to apply, explains which have long timescales and flags any seasonal window gives a client a realistic picture before anybody draws anything. The domestic version is covered in permit and inspection questions on remodelling projects, handled with the care in how to handle sensitive questions in your chatbot. See features, start at try, and the sector view sits under b2b.

Frequently asked questions

What approvals does a construction project need?
It varies by project and jurisdiction, and typically involves planning permission, building control, and separately anything required by utilities, highways, environmental bodies or a landlord.
Who obtains the approvals?
Usually a combination of the client, the design team and specialist consultants, and confusion about who is responsible for which is a common cause of something simply not being applied for.
When should approvals start?
As early as the design allows, because they run in their own timescales that nobody controls, and they are almost always the critical path on a project programme.

Want a 24/7 AI Employee for Your Website?

See how SpideyChat can answer customer questions, capture leads and handle enquiries while your team is offline.

No obligation. We will review your website and show you how SpideyChat could work for your business.

Keep reading